English
繁體中文
中文
English
English
繁體中文
中文
EnglishSolution
Delivered in 65 days, 4 robots tighten 34 screws on the top cover at a 74s cycle, based on 2D vision positioning.
Delivered in 70 days, with 1 robot operating at a 74-second cycle, using 2D vision to accurately locate and handle the battery control boxes coming on the double-speed chain conveyor.